crescent house

JANUARY 2026
26/00107/LBC
26/00106/FULL
Works pertaining to fire safety, building services, external repairs and redecorations, and other associated works.

DECEMBER 2024
24/01271/LDC 
Submission of a method statement setting out the methodology for the cleaning and replacement of the mosaic tiles, including those found on the ground floor colonnade pursuant to condition 11 of planning permission 23/00466/FULL dated 13/12/2023

JULY 2024
24/00736/LDC
Submission of details pursuant to planning permission 23/00650/LBC (dated 13.12.2023) including details of methodology of condition survey of windows, details of repairs and details of replacement windows pursuant to condition 5; details of spandrel panels and translucent glass pursuant to condition 7 (parts (a) and (b) only); and details to soffits and vaulted roofs, and oiled finish to window frames, pursuant to condition 8.

24/00735/MDC
Submission of details pursuant to planning permission 23/00466/FULL (dated 13.12.2023) including details of methodology of condition survey of windows, details of repairs and details of replacement windows pursuant to condition 5; details of spandrel panels and translucent glass pursuant to condition 7 (parts (a) and (b) only); and details to soffits and vaulted roofs, and oiled finish to window frames, pursuant to condition 9.

MAY 2023
23/00466/FULL
23/00650/LBC
Repairs and minor alterations to the existing windows and window framing at first, second and third floor levels of Crescent House, including: stripping, repairing and redecorating existing window frames; replacement of existing single-glazing with vacuum glazing panels; insulation works to the main concrete vaulted roof and first floor concrete soffit; and associated works.V

Planning consent letter outlining conditions can be read here 

bayer house pilot flat

FEBRUARY 2025
25/00236/LBC
Replacement of existing glazing to three windows to Flat 2, Bayer House with new clear (temporary planning permission for 1 year).

 25/00235/FULL
Replacement of existing glazing to three windows to Flat 2, Bayer House with new clear glass (temporary planning permission for 1 year).

crescent house pilot flat

JUNE 2023
23/00622/MDC
Submission of details pursuant to Condition 8 (Condition Survey) of planning permission 22/00322/FULL dated 21.09.2022

23/00602/LDC
Submission of details pursuant to Condition 9 (Condition Survey) of listed building consent 22/00323/LBC dated 19.07.2022.

MARCH 2023
23/00226/LDC
Submission of details pursuant to Condition 4 (Photographic Survey of exisiting Windows, Frames and Ironmongery) of listed building consent ref 22/00323/LBC dated 21 Sept 2022.

23/00227/MDC
Submission of details pursuant to Condition 4 (Photographic Survey of Exisiting Windows, Frames and Ironmongery) and 12 (Scheme of Protective Works) of planning permission ref 22/00322/FULL dated 21 Sept 2022.

FEBRUARY 2023
23/00161/LDC
Submission of details pursuant to Conditions 5, 6, and 7 (Windows Frame Stripping, Dismantling, and Adaptation Method Statements) of listed building consent ref 22/00323/LBC dated 21 Sept 2022.

23/00160/MDC
Submission of details pursuant to Conditions 5 & 6 (Windows Dismantling and Adaptation Method Statement) of planning permission ref 22/00322/FULL dated 21 Sept 2022.

APRIL 2022
22/00323/LBC
Alterations to and replacement of existing single-glazed windows and framing structure for a temporary period of 2 years to sequentially test double and triple glazing options, together with installation of insulation to internal walls of flat.

22/00322/FULL
Alterations to and replacement of existing single-glazed windows and framing structure for a temporary period of 2 years to sequentially test double and triple glazing options.